Home | New | About Us | Categories | Policy | Links
Time Passages Nostalgia Company
Ron Toth, Jr., Proprietor
72 Charles Street
Rochester, New Hampshire 03867-3413
Phone: 1-603-335-2062
Email: ron.toth@timepassagesnostalgia.com
 
Search for:  
Select from:  
Show:  at once pictures only 
previous page
 Found 126 items 
next page
 0178 ... b049 b139 b505 b646 b648 ... e876 ... m518 ... q740
1962 Welcome Back From Orbit John Glenn Souvenir Pin Back Button With Ribbon
Item #b505
Sold
Click here now for this limited time offer
Check Out With PayPalSee Our Store Policy

My items on eBay

Any group of items being offered as a lot must be sold as a lot.
You don't have to be an eight year old to enjoy having
a childhood treasure.
An Ever Changing Inventory
Gift Certificate
Unique & Fun Nostalgic Items
Quantity Discount Prices
(when available)
Quality Merchandise At Reasonable Prices
Worldwide Sales
It's never too late to
have a happy childhood!
 
This item is already sold1962 Welcome Back From Orbit John Glenn Souvenir Pin Back Button With Ribbon
John Glenn   Mercury   Astronaut   Space   Transportation   Rocket   Souvenir   Pin Back Button   Ribbon   History   Historic
The picture shows a view of this 1962 Welcome Back From Orbit John Glenn Souvenir Pin Back Button With Ribbon. The pinback button pictures John Glenn in his space suit helmet. The pin back button and ribbon are marked as follows:

WELCOME BACK TO EARTH, GLENN
COL. JOHN GLENN
WELCOME BACK TO EARTH
FIRST MAN IN ORBIT
3 TIMES AROUND THE WORLD
CAPE CANAVERAL, FLA.
FEB. 20, 1962

The pin and ribbon together measure about 5-7/8'' long. It is in excellent condition as pictured. Below here is the historical reference information from this mission:

John Glenn Becomes First Man To Orbit The Earth
20Th February 1962

As part of Project Mercury, The Friendship 7 spacecraft craft was launched on the 20th February 1962 with astronaut John Glenn on board. He became the third American in space and the first man to orbit the Earth . All the details of the mission are below.

Mission Objective:
Place a man into earth orbit, observe his reactions to the space environment and safely return him to earth to a point where he could be readily found. The Mercury flight plan during the first orbit was to maintain optimum spacecraft attitude for radar tracking and communication checks.

Payload:
Spacecraft No. 13, Vehicle Number 109 - D

Orbit:
Altitude: 162.2 x 100 statute miles
Inclination: 32.54
Orbits: 3
Period: 88min 29sec
Duration: 0 Days, 4 hours, 55 min, 23 seconds
Distance: 75,679 statute miles
Velocity: 17,544 mph
Max Q: 982 psf
Max G: 7.7

Launch:
February 20, 1962. 9:47:39 am EST. Cape Canaveral Launch Complex 14. Powered flight lasted 5 minutes 1 second and was completed normally. The mercury countdown began on February 1st 1962 and was performed in two parts. Precount checks out the primary spacecraft systems, followed by a 17.5 hour hold for pyrotechnic checks, electrical connections and peroxide system servicing. Then the countdown began. The launch countdown proceeded to the T-13 minute mark and then was canceled due to adverse weather conditions. After cancellation, the mission team decided to replace the carbon dioxide absorber unit and the peroxide system had to be drained and flushed to prevent corrosion. Launch vehicle systems were then revalidated and a leak was discovered in the inner bulkhead of the fuel tank that required 4 - 6 days to repair. The launch was rescheduled to 13th February and then to 14th February for all the bulkhead work to be completed. The precount picked up again on February 13th, 15th and 16th but was canceled each time due to adverse weather. The launch was then rescheduled for February 20th.

During the launch countdown on February 20th, all systems were energized and final overall checks were made. the count started at T-390 minutes by installing and connecting the escape rocket igniter. The service structure was then cleared and the spacecraft was powered to verify no inadvertent pyrotechnic ignition. The personnel then returned to the service structure to prepare for static firing of the reaction control system at T-250 minutes. The spacecraft was then prepared for boarding at T-120 minutes. The hatch was put into place at T-90 minutes. During installation a bolt was broken, and the hatch had to be removed to replace the bolt causing a 40 minute hold. From T-90 to T-55 final mechanical work and spacecraft checks were made and the service was evacuated and moved away from the launch vehicle. At T-45 minutes, a 15 minute hold was required to add fuel to the launch vehicle and at T-22 minutes and additional 25 minutes was required for filling the liquid-oxygen tanks as a result of a minor malfunction in the ground support equipment used to pump liquid oxygen into the launch vehicle. At approximately T-35 minutes, filling of the liquid-oxygen tanks began and final spacecraft and launch vehicle systems checks were started.

At T-10 minutes the spacecraft went on internal power. At T-6min 30 seconds, a 2 minute hold was required to make a quick check of the network computer at Bermuda. The launch vehicle went on internal power at T-3 minutes. At T-35 seconds the spacecraft umbilical was ejected and at T-0 the main engines started. Lift Off occurred at T+4 seconds at 9:47:39 am EST.

Landing:
February 20, 1962. 14:43:02 am EST. 800 miles southeast of Bermuda. Recovered by the destroyer USS Noa. Lookouts on the destroyer sighted the main parachute at an altitude of 5,000 ft from a range of 5nm. The Noa had the spacecraft aboard 21 minutes after landing and astronaut John Glenn remained in the spacecraft during pickup. Original plans had called for egress through the top hatch but Glenn was becoming uncomfortably warm and it was decided to exit by the easier egress path.

Mission Highlights:
Mission Successful. First American in orbit. Total time weightless 4 hours 48 min 27sec. During the flight only two major problems were encountered: (1) a yaw attitude control jet apparently clogged at the end of the first orbit, forcing the astronaut to abandon the automatic control system for the manual electrical fly-by-wire system; (2) a faulty switch in the heat shield circuit indicated that the clamp holding the shield had been prematurely released- a signal later found to be false. During reentry, however, the retropack was not jettisoned but retained as a safety measure to hold the heat shield in place in the event it had loosened.

Click on image to zoom.
1962 Welcome Back From Orbit John Glenn Souvenir Pin Back Button With Ribbon


Powered by Nose The Hamster (0.1,1)
Thu, Mar 28, 2024 at 08:07:36 [ 183 0.08 0.09]
 
© 1997-2024, Time Passages Nostalgia Company / Ron Toth, Jr., All rights reserved